To provide safe access and associated services on Castle Peak “A” Power Station (CPA), Castle Peak “B” Power Station (CPB), Black Point Power Station (BPPS) and Penny’s Bay Power Station (PBPS):
- Scaffold work for BPPS 400KV Substation Bay 3 and Bay 8 installation
- Scaffold work for B2 Boiler Mill and Feeder temporary access for construction
- Scaffold work for 400Kv bay 7 GIS isolation, modification, jumper disconnect & reconnect, HV test
- Scaffold work for A3 boiler for top dead space area
- Scaffold work and lifting operation for BPPS rigger store relocation
- Scaffold work for Pig Launcher Pipeline Painting in BPPS
- Scaffold work for CPA FBA Apron
- Scaffold work for B4 Drum Screen pit
- Scaffold work for B4 Generator for hydrogen cooler dismantle
- Scaffold work for B2 Generator Turbine hall for Generator casing & Hydrogen cooler
- Scaffold work for C1-C8 Turbine hall Basement Refurbishment
- Scaffold work for A4 Silencer Replacement
- CPPS (B2 and B4) Boiler top dead space cleaning
- CPA and CPB control building water tank cleaning
- CPPS A3 Turbine Hall Pipe Cladding Refurbishment
- CPPS (B3, A4, B4) Turbine and Turbine Hall cleaning
- GRS Piping and Structure Beam Painting
- CPPS (B2 and B4) Boiler Thermal insulation replacement
- Overhaul Site Setup Service for CPPS (B3 and B4)
- Lifting Service for CPPS Boiler (B3, B2 and B4) and BPPS Boiler (C4 and C6)
- CPPS A3 Silencer